AUGAF
  • Home
  • Politics
  • Business
  • National
  • News
  • Finance
  • Technology
  • Sports
  • International
  • CommoditiesNew
  • Contact
No Result
View All Result
  • Home
  • Politics
  • Business
  • National
  • News
  • Finance
  • Technology
  • Sports
  • International
  • CommoditiesNew
  • Contact
No Result
View All Result
AUGAF
No Result
View All Result
Home Business

Hyderabad Sukkur $6 Billon Motorway to be Completed in 30 Months

admin-augaf by admin-augaf
September 16, 2022
in Business, Finance
Reading Time: 3 mins read
0
Work on Sukkur-Hyderabad Motorway to start soon: Murad Saeed
Share on FacebookShare on TwitterWhatsapp

Islamabad September 16 2022: The Federal Communication Minister Molana Asad Mehmood and Sindh Chief Minister Syed Murad Ali Shah held a meeting here on Friday at Shahbaz Building to discuss the construction of Hyderabad-Sukkur Motorway.

The federal minister informed that the road was being construct on Built Operate and Transfer (BOT) basis.

According to him, the cost of the project would be Rs1.37 trillion equivalent to USD 6 billion.

The minister said all the projects executed or to be executed under National Highway Authority (NHA) in Sindh were the government’s priority.

The CM Sindh said M6 Hyderabad-Sukkur Motorway was a very important road but it was ignored because it was not included in the China Pakistan Economic Corridor (CPEC) projects.

“We want to see the center expedite work on this project,” the CM underlined.

He observed that the federal Public Sector Development Program (PSDP) also included construction of a bridge on River Indus and a 190 kilometers road.

Shah pointed out that construction of a interchange on M5 Sukkur-Multan Motorway at Mirpur Mathelo and connecting the motorway with the National Highway were also approved projects.

The study for building a bypass in Kambar-Shahdadkot district, Sukkur-Rohri bridge and Lyari Elevated Front Corridor were some other federal projects awaiting execution, he said.

He requested the federal government to speed up all those projects.

The CM said leaving aside Hyderabad-Sukkur motorway, all other motorway projects had been completed.

He pointed out that the M6 connected 6 districts of Sindh.

“The people of Sindh are facing problems in travelling because the motorway project hasn’t been completed,” he told.

He apprised that keeping in view the delay in the project he wrote a letter to Prime Minister Shahbaz Sharif.

He informed that the Sindh government was executing Malir Expressway project under Public Private Partnership (PPP) at the cost of Rs30 billion.

The CM also referred to the incomplete Jamshoro-Sehwan dual carriageway whose groundbreaking was performed on December 12, 2017.

He recalled that the Sindh government had then contributed Rs7 billion for the project while the remaining funds were supposed to come from the center.

Shah said Jamshoro-Sehwan road witnessed frequent accidents, adding that in 2018 he wrote a letter to former PM Imran Khan and apprised him that 196 innocent lives were lost on that road in a year.

The Chairman NHA Capt (r) Muhammad Khurram Agha expressed sadness over delay in completion of Hyderabad-Sukkur Motorway which was 306 Km long.

He said Pakistan Muslim League-Nawaz’s previous government had called bids but the same process lingered on during Pakistan Tehreek-e-Insaf’s government.

He assured that the project would be completed in 30 months.

The provincial minister Sharjeel Inam Memon and Jam Khan Shoro, Sindh Chief Secretary Sohail Rajput and other officers also attended the meeting.

Tags: HyderabadSukkur
admin-augaf

admin-augaf

Related Posts

Pakistan Textile Exports increased 26 percent to USD 14.26 billion YoY in 9MFY22: APTMA
Business

Pakistan’s Textile Exports Surge 32% in July, Led by Value-Added Segments

August 22, 2025
Gold
Business

Gold Fields Half-Year Profit Triples on Record Prices

August 22, 2025
Pakistan will get back $900 million payment of Reko Diq dispute if conditions not met
Business

ADB To Provide $410 Million For Reko Diq Project

August 22, 2025
Fair Global Consult Fair Global Consult Fair Global Consult
ADVERTISEMENT

Recent News

Pakistan Textile Exports increased 26 percent to USD 14.26 billion YoY in 9MFY22: APTMA

Pakistan’s Textile Exports Surge 32% in July, Led by Value-Added Segments

August 22, 2025
Gold

Gold Fields Half-Year Profit Triples on Record Prices

August 22, 2025
Pakistan will get back $900 million payment of Reko Diq dispute if conditions not met

ADB To Provide $410 Million For Reko Diq Project

August 22, 2025
Moody

Moody’s Upgrade Ratings of Five Pakistani Banks

August 20, 2025
EPQL accept PPIB proposal to operate plant on comingled fuel but at its own cost

EPQL Executed Supplemental Agreement to PPA with CPPA for Additional Gas

August 20, 2025

Popular News

  • NSS

    President Prohibit National Savings For Changing Rates on Existing Certificates Retrospectively

    0 shares
    Share 0 Tweet 0
  • Pakistan Rupee Appreciate against Dollar in Interbank as IMF Confirmed Board Review Date

    0 shares
    Share 0 Tweet 0
  • Pakistan Rupee Fall After 13 Days of Successive Gains against Dollar on Lower Remittances and Strengthening of US Dollar

    0 shares
    Share 0 Tweet 0
  • Petrol Prices in Pakistan to Return to July 2023 Levels

    0 shares
    Share 0 Tweet 0
  • Pakistan Central Bank Issued Show Cause Notice to Eight Banks Over Currency Speculation

    0 shares
    Share 0 Tweet 0

Categories

  • Budget
  • Business
  • Culture
  • Finance
  • International
  • National
  • News
  • Politics
  • PTI
  • Sports
  • Technology
AUGAF Logo

Follow us on social media:

Recent News

  • Pakistan’s Textile Exports Surge 32% in July, Led by Value-Added Segments
  • Gold Fields Half-Year Profit Triples on Record Prices
  • ADB To Provide $410 Million For Reko Diq Project

Category

  • Budget
  • Business
  • Culture
  • Finance
  • International
  • National
  • News
  • Politics
  • PTI
  • Sports
  • Technology

Recent News

Pakistan Textile Exports increased 26 percent to USD 14.26 billion YoY in 9MFY22: APTMA

Pakistan’s Textile Exports Surge 32% in July, Led by Value-Added Segments

August 22, 2025
Gold

Gold Fields Half-Year Profit Triples on Record Prices

August 22, 2025
  • Home
  • Politics
  • News
  • Business
  • National
  • Finance
  • Technology
  • International

© 2021 AUGAF.

No Result
View All Result
  • Home
  • Politics
  • Business
  • National
  • News
  • Finance
  • Technology
  • Sports
  • International
  • Commodities
  • Contact

© 2021 AUGAF.